Contract: Office Fit Out

Main contractor: Souness & Boyne


Duration Onsite: 5 weeks
Value: Circa £90,000.00

Disciplines: Mains distribution, smart metering, containment, small power, lighting, emergency lighting, lighting control system, alteration to base build fire alarm, intruder alarms, access controls, mechanical power, PA/ sound amplification, facilities for the disabled, structured cabling, inspection, testing & certification

The project consisted of stripping out and reconfiguration of the base build installation with the addition of a new lighting control system for the lecture theatres & meeting room. The new lighting system was primarily Dali controlled LED’s, surface mounted due to limited void depth of the building.

In addition to the above installations, we had to work closely with the clients’ representatives Jones Lang Lasalle, Architects’ Michael Laird Architect & Engineers’ KJ Tait to assist in achieving a Silver SKA rating